ArcelorMittal Italia restarts BF2, coking battery at Taranto steel plant

February 04, 2021 / www.metalbulletin.com / Article Link

ArcelorMittal Italia has resumed operations at blast furnace (BF) No2 and coke battery No9 at its Taranto steel plant in the south of Italy, the producer said on Wednesday February 3.

BF No2 was restarted on February 1. It had been closed in March 2020.
Currently, the producer is running furnaces No1, No2 and No4, and two steel mills are also operating.

On February 2, the producer also resumed operations at coke battery No9, idled since March 2013. The battery has...

Recent News

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok