Armadale scopes out Mahenge graphite project

By Staff reporter / March 27, 2018 / www.mining-journal.com / Article Link

The scoping study, carried out by project development consultants BatteryLimits, shows Mahenge could produce an average 49,000 tonnes per annum of high-quality graphite products during a 32-year mine life at an operating cost of US$408 per tonne based on an average life of mine grade of 12.5% total graphite carbon (TGC).

Recent News

Gold's Bull Market Pullbacks

April 28, 2025 / www.canadianminingreport.com

Gold stocks down on metal drop

April 28, 2025 / www.canadianminingreport.com

Investment banks ahead of the gold price, institutions still behind

April 21, 2025 / www.canadianminingreport.com

Gold stocks up, juniors outperform on small cap strength

April 21, 2025 / www.canadianminingreport.com

Gold stocks rebound to new highs

April 14, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok