The scoping study, carried out by project development consultants BatteryLimits, shows Mahenge could produce an average 49,000 tonnes per annum of high-quality graphite products during a 32-year mine life at an operating cost of US$408 per tonne based on an average life of mine grade of 12.5% total graphite carbon (TGC).