Armadale scopes out Mahenge graphite project

By Staff reporter / March 27, 2018 / www.mining-journal.com / Article Link

The scoping study, carried out by project development consultants BatteryLimits, shows Mahenge could produce an average 49,000 tonnes per annum of high-quality graphite products during a 32-year mine life at an operating cost of US$408 per tonne based on an average life of mine grade of 12.5% total graphite carbon (TGC).

Recent News

Smaller juniors still financed even in more cautious market

January 13, 2025 / www.canadianminingreport.com

Gold stocks shrug off equity market decline on metal gain

January 13, 2025 / www.canadianminingreport.com

Geopolitical risk outlook unclear after US election

January 06, 2025 / www.canadianminingreport.com

Low valuations offer a cushion to mining sector

January 06, 2025 / www.canadianminingreport.com

Polarized gold and iron ore moves, moderate aluminum and copper gains

December 30, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok