A summary of W Resources third-quarter results at its La Parilla, tungsten and tin project in the Extremadura region of Spain, according to a quarterly production report released on Wednesday October 21.
In brief: Tungsten and tin concentrate production totaled 77.6 tonnes during the quarter, down by 13% on a like-for-like basis and up by 104% on a pro-rata basis (third-quarter 2020 production was based on working three days a week). Tungsten concentrate production of 54.7 tonnes during the quarter was up by...