BHP trims base metal guidance; steps up growth plans

April 21, 2023 / www.mining-journal.com / Article Link

Geotechnical risk in a high-grade section of the Escondida pit has caused BHP to lower the mine's fiscal 2022-2023 (July-June) guidance for the operation to 1050-1080kt, from 1080-1180kt.

Recent News

Mining sector far outpaces tech over past three years

September 21, 2026 / www.canadianminingreport.com

Gold stocks down with GDXJ outperforming on rebalancing

September 21, 2026 / www.canadianminingreport.com

Copper slides as US apparently wavering on tariff hikes

September 14, 2026 / www.canadianminingreport.com

Historically huge distortion in global copper inventory balance

September 14, 2026 / www.canadianminingreport.com

Gold stocks pause along with metal price

September 07, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok