BHP trims base metal guidance; steps up growth plans

April 21, 2023 / www.mining-journal.com / Article Link

Geotechnical risk in a high-grade section of the Escondida pit has caused BHP to lower the mine's fiscal 2022-2023 (July-June) guidance for the operation to 1050-1080kt, from 1080-1180kt.

Recent News

Canadian political turmoil with Trump trade policy the catalyst

December 23, 2024 / www.canadianminingreport.com

Canada and US import tariffs remain low

December 23, 2024 / www.canadianminingreport.com

Major metals not gaining much on China stimulus announcements

December 16, 2024 / www.canadianminingreport.com

Spectre of stagflation looms over base metals

December 16, 2024 / www.canadianminingreport.com

TSXV large gold gains overall, but a mixed story underneath

December 09, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok