Botswana Diamonds to Begin Production This Year

By Rapaport News / March 26, 2019 / www.diamonds.net / Article Link

RAPAPORT... Botswana Diamonds will begin bulk sampling and diamondproduction from its Thorny River project in South Africa in May. It will then ramp up output to 20,000 tonnes a month, thecompany said Monday. The kimberlite ore will be processed at a nearby plant,which is currently being refurbished. In the six months ending December 31, the miner reported aloss of GBP 190,000 ($251,347). It has yet to post any revenue. Botswana Diamonds has a joint venture with Vast Diamonds inthe Heritage Concession portion of the Marange Diamond Fields in Zimbabwe,which is currently undergoing a study. It also holds 100% equity in Sunland Minerals in Botswana, afterbuying Russia-based miner Alrosa's stake for a nominal sum. Image: The Thorny River project. (Botswana Diamonds)

Recent News

AOCE and WB boost gold targets for 2025 significantly

November 10, 2025 / www.canadianminingreport.com

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok