Braveheart unveils PEA for new copper project

By Staff reporter / January 18, 2021 / www.mining-journal.com / Article Link

Neo Lithium moving closer to production

SPONSORED

neo lithium

Neo Lithium moving closer to productionsponsored-logo

Pantoro charging towards second gold mine

SPONSORED

pantoro limited

Pantoro charging towards second gold minesponsored-logo

Maximus ready to resume search for more Wattle Dam riches

SPONSORED

maximus resources

Maximus ready to resume search for more Wattle Dam richessponsored-logo

Decade of performance: Pitram delivers diamond standard for Argyle diamond mine

SPONSORED

micromine

Decade of performance: Pitram delivers diamond standard for Argyle diamond minepartner-logo

Braveheart closed the transaction with Cadillac Ventures on December 23, to acquire Thierry for consideration including C$300,000 in cash, at least 11 million in shares and a 2% net smelter return royalty.

Braveheart said the PEA by P&E Mining Consultants had found the project's 2012 resource estimates were valid for use in the study.

Neo Lithium moving closer to production

SPONSORED

neo lithium

Neo Lithium moving closer to productionsponsored-logo

Pantoro charging towards second gold mine

SPONSORED

pantoro limited

Pantoro charging towards second gold minesponsored-logo

Maximus ready to resume search for more Wattle Dam riches

SPONSORED

maximus resources

Maximus ready to resume search for more Wattle Dam richessponsored-logo

Decade of performance: Pitram delivers diamond standard for Argyle diamond mine

SPONSORED

micromine

Decade of performance: Pitram delivers diamond standard for Argyle diamond minepartner-logo

These comprised an underground measured and indicated 8.8 million tonnes at 1.66% copper and 0.19% nickel and an inferred 14.9Mt at 1.64% copper and 0.16% nickel. The project also has a near-surface K1-1 deposit with an inferred 53.6Mt at 0.38% copper and 0.1% nickel.

The PEA focused solely on the underground resource and Braveheart president and CEO Ian Berzins said he was "extremely pleased" with the result and the project's further potential.

The study indicated pre-production capex of $407 million, after-tax NPV6 of $242 million and IRR of 19%.

It envisaged a 14-year mine based on a 4,000tpd operation and used metal prices of US$3.48/lb copper, $8.00/lb nickel, $21/oz silver, $1,250/oz palladium, $1,100/oz platinum and $1,600/oz gold.

Braveheart said the PEA provided "a solid case" for moving the project forward.

Thierry is 15km from Pickle Lake.

Its underground workings were currently flooded, according to the company's website.

It said Thierry's previous owner UMEX had spend $104 million the camp, infrastructure, 4,000tpd mill and three shafts down to 1,700 feet for 28 miles of underground working.

Braveheart's main asset is the past-producing Bull River copper-gold-silver project in British Columbia, where an ore sorting study began this month.

The company had raised more than C$300,000 at 10c per unit in December to advance Bull River.

Its shares (TSXV: BHT) closed up 3.7% on Friday to 14c, towards the upper end of a one-year range of 4.5-17c, putting its market capitalisation just over $23 million (US$18 million).

Recent News

Uranium volatility after Russia's US export restrictions

November 25, 2024 / www.canadianminingreport.com

Gold stocks rebound on metal bounce and equity rise

November 25, 2024 / www.canadianminingreport.com

Crypto market size continues to catch up with gold

November 18, 2024 / www.canadianminingreport.com

Crypto stealing some of gold's thunder

November 18, 2024 / www.canadianminingreport.com

Gold stocks drop on metal price decline

November 11, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok