Colonial Coal floats PEA for Gordon Creek mine

By Canadian Mining Journal Staff / November 13, 2018 / www.mining.com / Article Link

Vancouver-based Colonial Coal International (TSX-V: CAD) has received the preliminary economic assessment for its 100% owned Gordon Creek metallurgical coal project located about 30 km south of Tumbler Ridge. Prepared by Stantec Consulting Services, the PEA demonstrates positive economics.

The Gordon Creek project has an after tax and royalty net present value of $690.5 million with a 7.5% discount rate. The internal rate of return will be 24.4% based on a price of $164.8 per tonne coking coal and a premium pulverized coal injection (PCI) price of $140.5 per tonne.

The project has a pre-production capex of $300 million with additional sustaining capital of $406.0 million over the life of the mine. When the project reaches commercial production, it will produce an average of 1.9 million tonnes of clean coal annually. The payback period is less than three years.

Colonial says the PEA is based on an underground mine plan that would recover 111.6 million run-of-mine tonnes with a yield of 51% to produce 57.4 million tonnes of clean coal over a 30-year life for the mine. The property contains an inferred resource of 298.0 million tonnes.

Recent News

Another 'Bubble Check' for the gold sector

September 08, 2025 / www.canadianminingreport.com

Gold stocks continue to hit new highs

September 08, 2025 / www.canadianminingreport.com

Some mining stocks exposed to Burkina Faso take major hit

September 02, 2025 / www.canadianminingreport.com

Gold stocks again hit new highs

September 02, 2025 / www.canadianminingreport.com

Gold stocks reach new highs on metal price gain

August 25, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok