Curzon Energy (LON:CZN) is ready for extensive well tests at Coos Bay coal bed methane project. Executive Director Thomas Wagenhofer tells Proactive how they will now be able to produce wells at better test rates. A five well workover programme has now been completed and outcomes have so far "completely correlated" with the pre-programme technical work, both on time and on budget. Sand and coal was removed from all five wellbores, and old down-hole equipment was also removed. Thomas says over the next few weeks they want to determine if wells can become commercially viable to kick the company off to phase 2, to design up to 58 models in the field.
Meet Netscientific PLC, discoverIE Group plc, Itaconix Plc and Realm Therapeutics plc at our event, London, 25 January 2018.Register here >>