Denison Mines begins environmental process for Wheeler River

By Canadian Mining Journal Staff / June 03, 2019 / www.mining.com / Article Link

Denison Mines of Toronto is ready to begin the rigorous environmental impact assessment of its 90% owned Wheeler River in situ uranium project in the Athabasca Basin.

Both the Canadian Nuclear Safety Commission and the Saskatchewan Ministry of Environment have accepted the Wheeler River provincial technical proposal and federal project description.

Denison has also said that it has executed a number of memoranda of understandings with Indigenous communities in support of the project.

The company says the choice of in situ recovery (ISR) has several important environmental and permitting advantages over conventional uranium mining. There will be no tailings management on surface, and very little waste rock will be generated. The footprint of the project is reduced. And closure and decommissioning at the end of the mine's life will be easier.

Wheeler River is the largest undeveloped uranium project in the Athabasca Basin. The property hosts the high grade Phoenix and Gryphon uranium deposits. The Phoenix deposit is amenable to ISR, and the Gryphon could become a conventional underground mine sometime in the future.

The project contains 132.1 million lb. of uranium oxide at a grade of 3.3% in the indicated category. Inferred resources contain 3.0 million lb. at a grade of 1.7%.

The Wheeler River pre-feasibility study was completed late last year. The EIA process and engineering studies and related programs are the next steps toward production.

(This article first appeared in the Canadian Mining Journal)

Recent News

Gold stocks up on rise in metals and equities

October 14, 2024 / www.canadianminingreport.com

Gold stocks decline on flat metal and mixed equities

October 07, 2024 / www.canadianminingreport.com

Copper price expected to range from flat to slight gain in 2025

October 07, 2024 / www.canadianminingreport.com

China's gold holdings to central bank reserves still low

September 30, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok