EU GREEN STEELMAKING: Thyssenkrupp begins feasibility study for hydrogen hub

December 05, 2020 / www.metalbulletin.com / Article Link

German steelmaker Thyssenkrupp is conducting a joint feasibility study with energy company STEAG to develop a hydrogen hub to be used in green steel production at its Duisburg site, the company said on Thursday December 3.

The study will focus on construction of a water electrolysis plant at the STEAG site in Duisburg-Walsum by Thyssenkrupp Uhde Chlorine Engineers, the structuring of energy supply and operation of the electrolysis plant by STEAG, and the supply of green hydrogen and oxygen to Thyssenkrupp's mill in Bruckhausen.
The water electrolysis system will be installed by Thyssenkrupp Uhde Chlorine Engineers' Green Hydrogen product division and will consist of pre-fabricated standard modules.

"We are excited to contribute our 50 years of experience in the planning, construction and operation...

Recent News

Immediate trigger for crash was new Fed Chairman pick

February 02, 2026 / www.canadianminingreport.com

Gold stocks slump on metal price decline

February 02, 2026 / www.canadianminingreport.com

Is the gold market starting to turn 'irrationally exuberant'?

January 26, 2026 / www.canadianminingreport.com

Gold stocks explode up as equity markets languish

January 26, 2026 / www.canadianminingreport.com

Gold stocks outpace flat large caps

January 19, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok