EU GREEN STEELMAKING: Thyssenkrupp begins feasibility study for hydrogen hub

December 05, 2020 / www.metalbulletin.com / Article Link

German steelmaker Thyssenkrupp is conducting a joint feasibility study with energy company STEAG to develop a hydrogen hub to be used in green steel production at its Duisburg site, the company said on Thursday December 3.

The study will focus on construction of a water electrolysis plant at the STEAG site in Duisburg-Walsum by Thyssenkrupp Uhde Chlorine Engineers, the structuring of energy supply and operation of the electrolysis plant by STEAG, and the supply of green hydrogen and oxygen to Thyssenkrupp's mill in Bruckhausen.
The water electrolysis system will be installed by Thyssenkrupp Uhde Chlorine Engineers' Green Hydrogen product division and will consist of pre-fabricated standard modules.

"We are excited to contribute our 50 years of experience in the planning, construction and operation...

Recent News

Silver inventories rebound in UK, output from major producers rises

December 15, 2025 / www.canadianminingreport.com

Silver's three-month outperformance continues

December 15, 2025 / www.canadianminingreport.com

Silver & Copper Supply Distortions Continue

December 08, 2025 / www.canadianminingreport.com

Gold stocks down in risk-on shift

December 08, 2025 / www.canadianminingreport.com

Gold stocks rocket on metal rebound and equities jump

December 01, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok