EU GREEN STEELMAKING: Thyssenkrupp begins feasibility study for hydrogen hub

December 05, 2020 / www.metalbulletin.com / Article Link

German steelmaker Thyssenkrupp is conducting a joint feasibility study with energy company STEAG to develop a hydrogen hub to be used in green steel production at its Duisburg site, the company said on Thursday December 3.

The study will focus on construction of a water electrolysis plant at the STEAG site in Duisburg-Walsum by Thyssenkrupp Uhde Chlorine Engineers, the structuring of energy supply and operation of the electrolysis plant by STEAG, and the supply of green hydrogen and oxygen to Thyssenkrupp's mill in Bruckhausen.
The water electrolysis system will be installed by Thyssenkrupp Uhde Chlorine Engineers' Green Hydrogen product division and will consist of pre-fabricated standard modules.

"We are excited to contribute our 50 years of experience in the planning, construction and operation...

Recent News

China's gold holdings to central bank reserves still low

September 30, 2024 / www.canadianminingreport.com

China has broad effect on gold market

September 30, 2024 / www.canadianminingreport.com

Gold stocks mixed after previous week's huge gains

September 23, 2024 / www.canadianminingreport.com

Large TSXV gold multiple driven up by high Artemis weighting

September 23, 2024 / www.canadianminingreport.com

Monetary-driven precious metals outperform major base metals

September 09, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok