Excelsior receives first acid at Gunnison

By Staff Reporter / August 14, 2019 / www.mining-journal.com / Article Link

Quality emerges at Galan's blue-chip lithium address

SPONSORED

galan lithium

Quality emerges at Galan's blue-chip lithium addresssponsored-logo

The company completed construction of three acid storage tanks in July with capacity of 7,500 tonnes and a new acid unloading facility.

"The pure sulphuric acid in these tanks is diluted down to a weak sulphuric acid mining solution via the new acid handling and delivery system. This weaker acid solution is used in the wellfield operations to leach the copper from the naturally fractured rocks below ground," said COO Roland Goodgame in a statement.

Quality emerges at Galan's blue-chip lithium address

SPONSORED

galan lithium

Quality emerges at Galan's blue-chip lithium addresssponsored-logo

Gunnison, the first new copper project to be fully permitted in the US in over a decade, is an insitu recovery copper extraction project permitted to produce 125 million pounds a year of copper cathode

Triple Flag Mining Finance provided a US$75 million funding package to build the mine comprising a $65 million copper stream and a $10 million private placement.

Shares in Excelsior Mining (TSX:MIN) are trading at C94¢, valuing the company at $222.4 million.

Recent News

Gold stocks rise but lag broader equity gains

January 20, 2025 / www.canadianminingreport.com

Wesdome, Seabridge and Skeena report outstanding drill results

January 20, 2025 / www.canadianminingreport.com

Smaller juniors still financed even in more cautious market

January 13, 2025 / www.canadianminingreport.com

Gold stocks shrug off equity market decline on metal gain

January 13, 2025 / www.canadianminingreport.com

Geopolitical risk outlook unclear after US election

January 06, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok