Friedland's Ivanhoe picks up the pace in DRC

November 08, 2022 / www.mining-journal.com / Article Link

The Kamoa-Kakula project in the Democratic Republic of the Congo has produced at an annualised rate of over 400,000t of floated and filtered copper for the second month in a row.

Recent News

A rebalancing of gold's ratios versus major commodities

July 14, 2026 / www.canadianminingreport.com

Gold stocks down on slide in gold price

July 14, 2026 / www.canadianminingreport.com

US tariff decision expected to be major copper catalyst

July 07, 2026 / www.canadianminingreport.com

Gold stocks rebound from near lows

July 07, 2026 / www.canadianminingreport.com

Gold stocks decline as metal price drops

June 29, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok