Glencore cuts Mutanda copper mining output by 100,000 tpy

February 21, 2019 / www.metalbulletin.com / Article Link

Glencore will cut copper production at its Mutanda mine in the Democratic Republic of Congo by 100,000 tonnes, the company said on Wednesday February 20.

Cobalt hydroxide production at the mine, which totaled 27,300 tonnes last year, will not be affected. "In [the fourth quarter] 2018, a significant downward revision in the amount and timing of copper oxide reserves at our Mutanda copper operations in the DRC (metals and minerals segment) was highlighted," the company said in its 2018...

Recent News

AOCE and WB boost gold targets for 2025 significantly

November 10, 2025 / www.canadianminingreport.com

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok