Granada updates resources in feasibility study

By Canadian Mining Journal Staff / December 12, 2018 / www.mining.com / Article Link

A sample of visible gold from the Granada gold mine. (Image: Granada Gold Mine)

QUEBEC - SGS Canada has delivered an updated mineral resource of the Granada gold property near Rouyn-Noranda. Owner Granada Gold Mine, headquartered in Rouyn-Noranda, was also supplied with a revised block model for the entire area.

Pit constrained measured and indicated resources are 22.4 million tonnes grading 1.13 g/t gold and containing 813,000 oz. The inferred resource is 6.9 million tonnes at 2.04 g/t and containing 455,000 oz. of gold. A gold cut-off of 0.4 g/t was used in these calculations.

The Granada gold mine was active in the 1930s before fire destroyed the surface buildings. During that time it produced 50,000 oz. of gold. The company has obtained all the necessary permits to begin the first mining phase as a "rolling start", and stripping has already begun. Initial output will be 25,000 oz. of gold per year, rising eventually to 100,000 oz. per year.

Additional information is available at www.GranadaGoldMine.com.

This story first appeared at Canadian Mining Journal

Recent News

Another 'Bubble Check' for the gold sector

September 08, 2025 / www.canadianminingreport.com

Gold stocks continue to hit new highs

September 08, 2025 / www.canadianminingreport.com

Some mining stocks exposed to Burkina Faso take major hit

September 02, 2025 / www.canadianminingreport.com

Gold stocks again hit new highs

September 02, 2025 / www.canadianminingreport.com

Gold stocks reach new highs on metal price gain

August 25, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok