Hydro resumes operations at bauxite mine, Alunorte production to ramp up

October 10, 2020 / www.metalbulletin.com / Article Link

Production at Hydro's Alunorte alumina refinery in Brazil will ramp back up now that maintenance at the Paragominas bauxite mine has finished, the producer said on Friday October 9.

"On October 8, Hydro resumed operation of the pipeline transporting bauxite from Hydro Paragominas bauxite mine to the Hydro Alunorte alumina refinery in Brazil," Hydro said.
Production at Paragominas bauxite mine has resumed and alumina production is now being ramped up at Alunorte, the company said. 

Recent News

Many new players enter TSXV gold Top 25 by market cap

July 14, 2025 / www.canadianminingreport.com

Gold stocks mixed on moderate metal gain, flat equities

July 14, 2025 / www.canadianminingreport.com

Gold stocks lead the large cap miners by far over H1/25

July 07, 2025 / www.canadianminingreport.com

Gold stocks up as the metal price and equities gain

July 07, 2025 / www.canadianminingreport.com

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok