Hydro resumes operations at bauxite mine, Alunorte production to ramp up

October 10, 2020 / www.metalbulletin.com / Article Link

Production at Hydro's Alunorte alumina refinery in Brazil will ramp back up now that maintenance at the Paragominas bauxite mine has finished, the producer said on Friday October 9.

"On October 8, Hydro resumed operation of the pipeline transporting bauxite from Hydro Paragominas bauxite mine to the Hydro Alunorte alumina refinery in Brazil," Hydro said.
Production at Paragominas bauxite mine has resumed and alumina production is now being ramped up at Alunorte, the company said. 

Recent News

Gold stocks decline on flat metal and mixed equities

October 07, 2024 / www.canadianminingreport.com

Copper price expected to range from flat to slight gain in 2025

October 07, 2024 / www.canadianminingreport.com

China's gold holdings to central bank reserves still low

September 30, 2024 / www.canadianminingreport.com

China has broad effect on gold market

September 30, 2024 / www.canadianminingreport.com

Gold stocks mixed after previous week's huge gains

September 23, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok