Integra kicks off Phase I drilling at DeLamar, Idaho

February 14, 2018 / feedproxy.google.com / Article Link

Integra Resources ITR DeLamar 4

Integra Resources (ITR.V) only needed four weeks to receive the drill permits needed for its Phase I drill program on its DeLamar gold-silver project in Idaho. This short turnaround time ensured the company remains on schedule for its 2018 exploration plans of which this initial 6,000 meters of RC drilling (an increase of 50% compared to the original plans) is just the very first phase of a 20,000 meter drill program this year.

The entire 18 hole RC drill program will be focusing on the DeLamar deposit where Integra Gold aims to confirm its theory to discover high-grade vein extensions below the lower grade open pit. These holes will be relatively deep, reaching a vertical depth of 265 meters, but that's necessary to ensure Integra doesn't just scratch the surface as the previous operators appeared to do.

Integra Resources ITR DeLamar 5

The results of this initial 6,000 meter drill program will then be used to design a follow-up exploration program to aggressively pursue the higher grade structures which are just a few hundred meters below surface. We are waiting for the Florida Mountain technical report to be filed, where after you can expect a thorough update report from us as Integra 2.0 is ready to flex its muscles (again).

Recent News

Gold juniors continue to outperform

June 09, 2025 / www.canadianminingreport.com

Thor Explorations continues to lead TSXV global gold producers

June 02, 2025 / www.canadianminingreport.com

Gold stocks rise with juniors outperforming majors

June 02, 2025 / www.canadianminingreport.com

Gold Becomes Largest Metals Market

May 26, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok