KCM in Zesco power supply deal after CEC contract ends

June 03, 2020 / www.metalbulletin.com / Article Link

Konkola Copper Mines (KCM) has signed a provisional power supply agreement with Zambian state-owned utility Zesco Ltd after a long-term supply contract between the copper producer and the Copperbelt Energy Corporation (CEC) expired.

Zesco is now transmitting power via CEC infrastructure to KCM operations while the two parties finalize their agreement.

A 20-year contract between CEC and KCM, which operates Zambia's largest copper smelter, Nchanga, as well as the Konkola and Nchanga mines, expired on March 31. It was extended by mutual agreement to May 31, after which...

Recent News

Gold stocks lead the large cap miners by far over H1/25

July 07, 2025 / www.canadianminingreport.com

Gold stocks up as the metal price and equities gain

July 07, 2025 / www.canadianminingreport.com

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok