Klondex Mines Continues to Extend High Grade Mineralization at Fire Creek's Zeus Target, Including 1.65 opt Au over 35.0 ft

By Klondex Mines / January 26, 2018 / feedproxy.google.com / Article Link

TSX: KDX
www.klondexmines.com

Mr. Paul Huet reports:

Company Schedules Announcement of 2017 Operating Results and 2018 Guidance

VANCOUVER, British Columbia, Jan. 25, 2018 (GLOBE NEWSWIRE) -- Klondex Mines Ltd. (TSX:KDX) (NYSE American:KLDX) ("Klondex" or the "Company") is pleased to provide the final results of the 2017 surface exploration drill program on the Zeus target at its Fire Creek Mine ("Fire Creek") located in northern Nevada, USA.

Surface Exploration Drilling Highlights: (TABLE 1)

FCC-0095: 1.65 opt Au over 35.0 ft, or 56.65 g/t over 10.7 mIncluding 16.05 opt Au over 2.3 ft, or 550.3 g/t over 0.7 mIncluding 6.52 opt Au over 1.2 ft, or 223.41 g/t over 0.4
and 0.41 opt Au over 3.4 ft, or 13.95 g/t over 1.0 mFCC-0097: 0.14 opt Au over 15.8 ft, or 4.75 g/t over 4.8 m  FCC-0107: 0.16 opt Au over 15.0 ft, or 5.57 g/t over 4.6 m   

Surface Exploration Drill Summary: (FIGURE 1)
Seven surface holes were drilled in 2017 totaling 9,868.5 ft (3,007.9 m). The final results from the last four holes of the drill program were recently received. The focus of this drill program was to infill and step out from last year's drilling with the intent to develop a resource within this mineralized structural corridor. Klondex expects to release an updated resource estimate for Nevada operations during the first quarter of 2018.     

Surface Exploration Drilling Key Points: (FIGURES 2 and 3)
This surface exploration drill program builds on results previously released in 2017 (reported in a press release dated November 15, 2017) and the 2016 exploration program which successfully tested a north-south geophysical anomaly located about 4,000 ft (1,219 m) northwest of the current mine workings. This drilling has identified a zone of high grade mineralization within the Zeus structural corridor, approximately 900 ft (274 m) in length and 400 ft (122 m) vertical. This high grade zone is within 400 ft (122 m) of surface and is open in all directions. Additional drilling is scheduled in 2018 as Klondex expects to continue to infill and extend this significant high grade mineralization.

Mr. Brian Morris, Senior Vice President, Exploration, said, "The final 2017 drill results continue to support the tremendous potential to expand the high grade resource in the Fire Creek District." Mr. Morris elaborated, "In addition, we are seeing evidence of a halo of lower grade mineralization outside the high grade structures, similar to the Fire Creek open pit resource. Moreover, geophysics suggest that Zeus is part of a major 6,500 ft (1,981.2 m) structural corridor which we plan to continue to define along strike in 2018." 

2017 Operating Results and 2018 Guidance

Klondex will provide 2017 operating results and 2018 guidance metrics before the United States and Canada financial markets open on Wednesday, February 7, 2018. The Company will further discuss this information during its Investor Day meeting to take place the same day at 9:00 am Eastern Standard Time.

Assays were performed by American Assay Laboratories of Sparks, Nevada, as directed under the supervision of Klondex staff. This organization is an ISO 17025 accredited independent laboratory.

A description of the data verification methods, quality assurance program and quality control measures applied can be found in the technical report titled "Technical Report for the Fire Creek Project, Lander County, Nevada", dated March 28, 2016 and with an effective date of June 30, 2015 which is available under the Company's issuer profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Qualified Person
Scientific and technical information in this press release has been reviewed and approved by Brian Morris (AIPG CPG-11786), a "qualified person" within the meaning of NI 43-101.

About Klondex Mines Ltd. (www.klondexmines.com)
Klondex is a junior-tier gold and silver mining company focused on exploration, development, and production in a safe, environmentally responsible, and cost-effective manner. The Company has 100% interests in four producing mineral properties: the Fire Creek Mine, the Midas Mine and ore milling facility, the Hollister Mine, all of which are located in the state of Nevada, USA, and the True North Mine and mill in Manitoba, Canada. The Company also has a 100% interest in the Aurora mine and ore milling facility, also located in Nevada, USA.

Recent News

China's gold holdings to central bank reserves still low

September 30, 2024 / www.canadianminingreport.com

China has broad effect on gold market

September 30, 2024 / www.canadianminingreport.com

Gold stocks mixed after previous week's huge gains

September 23, 2024 / www.canadianminingreport.com

Large TSXV gold multiple driven up by high Artemis weighting

September 23, 2024 / www.canadianminingreport.com

Monetary-driven precious metals outperform major base metals

September 09, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok