MMK Metalurji starts HRC production

July 13, 2021 / www.metalbulletin.com / Article Link

Magnitogorsk Iron & Steel Works' (MMK) Metalurji subsidiary in Turkey has started trial production of hot-rolled coil, the Russian company announced on Monday July 12.

Located in the Iskenderun region, the mill halted operations at its meltshop and compact strip mill in late 2012.

"The current situation allows us to resume operations at the electric-arc furnace facility, which is a very important component of our Turkish asset," Viktor Rashnikov, chairman of the MMK board of...

Recent News

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok