New semi-movil crusher will take production to 85Mtpy

By Paul Harris / July 22, 2019 / www.mining-journal.com / Article Link

Quality emerges at Galan's blue-chip lithium address

SPONSORED

galan lithium

Quality emerges at Galan's blue-chip lithium addresssponsored-logo

In its latest sustainability technical report, Antamina said it planned to reconfigure the ore crusher platform and use a semi-mobile crusher with a 13,200 tonnes per hour capacity, which will see the operation process some 85 million tonnes per year of material.

The company also plans to optimise the internal water management system, prepare an area for internal access, implement a waste transport system, modify platforms for piping and the storage of LPG and lubricants. Other modifications are to optimise the domestic wastewater treatment system and make changes in the system of water recovered from the process and the domestic wastewater treatment system.

Quality emerges at Galan's blue-chip lithium address

SPONSORED

galan lithium

Quality emerges at Galan's blue-chip lithium addresssponsored-logo

Antamina principally produces copper and zinc, and is a joint venture between BHP (33.75%), Glencore (33.75%), Teck (22.5%) and Mitsubishi (10%).

Recent News

Rising metals price volatility over past month

January 12, 2026 / www.canadianminingreport.com

Gold stocks surge ahead of equities on metal price gain

January 12, 2026 / www.canadianminingreport.com

Base metals outlook for 2026 opaque after decent rise last year

January 07, 2026 / www.canadianminingreport.com

Gold and silver stocks far outpace the major markets

January 07, 2026 / www.canadianminingreport.com

Bank of Japan boosts rates, continuing an unwinding carry trade

December 22, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok