NEWSBREAK: Glencore's Mutanda to gradually ramp up in 2022-2025

May 20, 2021 / www.metalbulletin.com / Article Link

Glencore is to "gradually ramp up" its Mutanda copper-cobalt facility from care and maintenance to 20,000 tonne per year production of cobalt between the second half of 2022 through 2025, according to Ash Lazenby, cobalt trader at Glencore.

This adds to comments from head cobalt trader, David Brocas, who had stated on Tuesday May 18 that the mining company would "not hesitate bringing back online part or all" of the asset in the Democratic Republic of Congo (DRC)
Brocas and Lazenby were speaking on separate panels at the Cobalt Institute's online-only event held on May 18-19.

Glencore placed Mutanda...

Recent News

Global trade tensions ease and inflation continues to decline

May 19, 2025 / www.canadianminingreport.com

Gold stocks down as metal slumps and equities rise

May 19, 2025 / www.canadianminingreport.com

Big Gold has another strong quarter, but some signs growth cooling

May 12, 2025 / www.canadianminingreport.com

Gold stocks nearly regain highs on rising metal price

May 12, 2025 / www.canadianminingreport.com

Gold stocks down as risk on move continues

May 05, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok