Osisko sees 160kozpa in Cariboo feasibility

January 04, 2023 / www.mining-journal.com / Article Link

The initial three-year phase contemplates a 1500tpd operation from the Lowhee, Shaft and Mosquito deposits to produce 72,501ozpa with underground development to ramp up operations to 4,900tpd in year

Recent News

Geopolitical risk outlook unclear after US election

January 06, 2025 / www.canadianminingreport.com

Low valuations offer a cushion to mining sector

January 06, 2025 / www.canadianminingreport.com

Polarized gold and iron ore moves, moderate aluminum and copper gains

December 30, 2024 / www.canadianminingreport.com

Large TSXV stocks strong on company specific drivers

December 30, 2024 / www.canadianminingreport.com

Canadian political turmoil with Trump trade policy the catalyst

December 23, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok