Pasar copper smelter back online after technical failure - Glencore

By Julian Luk / February 12, 2018 / www.metalbulletin.com / Article Link

Glencore's Pasar copper smelter has returned to operation after fixing a technical failure that led to a production halt last month, the company told Metal Bulletin.

"The problem has been resolved and the smelter is back online," Glencore spokesman Charles Watenphul said in an emailed statement. The spokesman declined to provide details on the repairs undertaken or comment on whether the 330,000 tonne per year smelter is operating at full capacity. The Pasar smelter, the only copper smelting facility in the Philippines, was shut down in early January following a...

Recent News

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com

Huge quantifiable rise in geopolitical, economic and trade risks

June 23, 2025 / www.canadianminingreport.com

Platinum clearly ahead of palladium for first time in seven years

June 16, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok