Petra Forced to Halt Production in South Africa

By Rapaport News / December 10, 2019 / www.diamonds.net / Article Link

RAPAPORT... Petra Diamonds has had to put operations on hold at itsthree South African mines, due to a restriction on power usage enforced by the local electricity provider. Eskom has told the miner to limit its power usage to "essential loads," Petra said Monday. As a result, Petra has halted production, hoisting and processing at its Cullinan, Finsch andKoffiefontein deposits, and removed all underground workers not needed for essential services. The electric company will only allow Petra to use power forpumping and ventilation to prevent flooding and maintain safety atthe sites, the miner noted. "Petra will update the market as soon as it receives furthernotification as to how long the load curtailment will last, and therefore whatimpact this is likely to have upon the company's production performance," itadded. Petra's share price has dropped 8% in early trading Tuesday. Image: The Finsch mine in South Africa. (Petra Diamonds)

Recent News

Gold stocks weaker but outperform slump in other sectors

October 13, 2025 / www.canadianminingreport.com

West Africa-focussed Robex and PDI to merge

October 13, 2025 / www.canadianminingreport.com

Gold stocks outperform equity market gains

October 06, 2025 / www.canadianminingreport.com

Most major producers rise but TSXV gold mixed

October 06, 2025 / www.canadianminingreport.com

Platinum, palladium, copper gain on green China, supply constraints

September 29, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok