Petra Production Hit by South Africa Power Woes

By IDEX Online Staff Reporter / December 11, 2019 / www.idexonline.com / Article Link

(IDEX Online) - Production at Petra Diamonds' South African mines has been hit by ongoing rolling power cuts across the country. 

Following a request by Eskom, the South African electricity utility, Petra halted produced, hoisting and processing at the Cullinan, Finsch and Koffiefontein mines on December 9. 

On December 10, Eskom downgraded the situation from the unprecedented Stage 6 load shedding to Stage 4. As a result, Petra restarted its mining operations with a 20-percent load curtailment, in line with requirements.

In an update, Petra said it is used to managing the operations optimally to maintain production levels as much as possible throughout load shedding requests. It said that such measures include bringing forward essential maintenance work and restricting load curtailment to processing plants where possible.

Recent News

Gold stocks outpace flat large caps

January 19, 2026 / www.canadianminingreport.com

TSXV gold producers' output growth for Q4/25 mixed

January 19, 2026 / www.canadianminingreport.com

Rising metals price volatility over past month

January 12, 2026 / www.canadianminingreport.com

Gold stocks surge ahead of equities on metal price gain

January 12, 2026 / www.canadianminingreport.com

Base metals outlook for 2026 opaque after decent rise last year

January 07, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok