PFS views Osino's Twin Hills as 'long-life, low-cost'...

September 07, 2022 / www.mining-journal.com / Article Link

The overall capital cost is viewed as $375 million with a 13-year life of mine and 5 million tonnes per annum processing capacity.

Recent News

Big Gold still struggling overall in 2026

September 28, 2026 / www.canadianminingreport.com

Gold stocks down on metal price pullback

September 28, 2026 / www.canadianminingreport.com

Mining sector far outpaces tech over past three years

September 21, 2026 / www.canadianminingreport.com

Gold stocks down with GDXJ outperforming on rebalancing

September 21, 2026 / www.canadianminingreport.com

Copper slides as US apparently wavering on tariff hikes

September 14, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok