RIO TINTO AT A GLANCE: Q3 copper, aluminium production down due to outages

October 19, 2019 / www.metalbulletin.com / Article Link

Rio Tinto's copper and aluminium production dropped due to unexpected shutdowns during the third quarter.

The company's Yarwun alumina refinery in Australia shut over the third quarter for 35 days; the shutdown has since ended.Total alumina production was down by 7% during the third quarter at 1.8 million tonnes.At $278.25 per tonne, the Fastmarkets Alumina index, fob Australia has sunk to around two-year lows amid renewed supply from Hydro's Alunorte plant in Brazil.The shutdown meant that Rio ended up shipping...

Recent News

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok