South32 achieves record Al production at Hillside but loss in FY19 still expected [CORRECTED]

July 19, 2019 / www.metalbulletin.com / Article Link

Production at South32's Hillside aluminium smelter in South Africa increased by 3,000 tonnes to a record 715,000 tonnes during its 2019 financial year ended June 30, 2019, the producer said on Thursday July 18.

Sales at the smelter increased by 4% in the June 2019 quarter to 191,000 tonnes from 183,000 tonnes in the same quarter in 2018. "We achieved record annual production at Hillside... The smelter continued to test its maximum technical capacity, despite an increase in the frequency of load-shedding events," South32's quarterly report said. The producer also completed a restructure of the workforce during the June 2019 quarter to ensure the smelter's ongoing sustainability and to improve its cost competitiveness. Despite the continued strong operating performance during the year, lower aluminium prices and high...

Recent News

Gold stocks weaker but outperform slump in other sectors

October 13, 2025 / www.canadianminingreport.com

West Africa-focussed Robex and PDI to merge

October 13, 2025 / www.canadianminingreport.com

Gold stocks outperform equity market gains

October 06, 2025 / www.canadianminingreport.com

Most major producers rise but TSXV gold mixed

October 06, 2025 / www.canadianminingreport.com

Platinum, palladium, copper gain on green China, supply constraints

September 29, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok