Trevali maintains 2018 production guidance

By Staff reporter / April 13, 2018 / www.mining-journal.com / Article Link

"As previously stated, first quarter production was planned to be lower than subsequent quarters, reflecting scheduled maintenance at our Santander operations and winter conditions at Caribou," said Trevali's president and CEO Dr Mark Cruise.

"We will continue to further optimise the operations through the remainder of the year and beyond."

Cruise said production guidance for the year was unchanged: 400-427Mlb of zinc, 43.8-46Mlb of lead, and 1.4-1.47Moz of silver.

He said Tevali's new flagship mine, Perkoa in Burkina Faso, had a solid first quarter and was well placed to "meet or potentially exceed annual guidance". Any update to guidance would occur post second quarter of 2018.

Rosh Pinah in Namibia has seen "significant improvements in the overall site performance" early in 2018 after strategic mining improvements began in the December quarter.

Caribou in Canada was through its standard challenging winter period and was now set for increased production this quarter "and for the balance of 2018", while Santander's mill repair was said to be fully complete and the "site will continue to process fresh ore from the mine for the remainder of the year at higher than designed throughput rates".

The mine in Peru established a stockpile of about 65,000t of run-of-mine ore in the first quarter.

 

Recent News

Gold stocks rebound to new highs

April 14, 2025 / www.canadianminingreport.com

US$ and bonds not the safe havens normally expected

April 14, 2025 / www.canadianminingreport.com

Crash driven by tech and highly cyclical sectors

April 07, 2025 / www.canadianminingreport.com

Gold stocks succumb only on second day of plunge

April 07, 2025 / www.canadianminingreport.com

Gold stocks outperform, New Found Gold down on initial MRE

March 31, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok