Vale to restart Alegria mine, keeps 2019 sales guidance unchanged

November 02, 2019 / www.metalbulletin.com / Article Link

Brazilian mining company Vale will resume operations at its Alegria mine through dry stacking to produce 1 million tonnes of iron ore in 2019, the company said, as it maintained its full-year sales volumes guidance of 307-332 million tonnes.

The restart was authorized by Brazil's national mining agency, ANM, which reverted a March decision that had halted the unit, the company said on Friday November 1.Output will be limited to 1 million tonnes of iron ore until year-end for safety reasons, it added."For the following years, production will gradually return, observing additionally the margin over volume strategy [of the company]," it said. "[Vale] expects sales to be between the lower [end] and midpoint of the range [in 2019]."The decision from ANM allows Vale to resume 8 million tonnes...

Recent News

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com

Huge quantifiable rise in geopolitical, economic and trade risks

June 23, 2025 / www.canadianminingreport.com

Platinum clearly ahead of palladium for first time in seven years

June 16, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok