Vale to resume output at Timbopeba site, boost mine's iron ore capacity by 7mln tpy

March 13, 2021 / www.metalbulletin.com / Article Link

Vale has started commissioning wet processing operations at its Timbopeba site, which is part of its Mariana iron ore complex in Brazil's southeastern Minas Gerais state, which will increase the mine's iron ore production capacity by 7 million tonnes per year.

The commissioning process is expected to last for two months, and will  increase production capacity to 12 million tpy, the company said on Friday March 12.
...

Recent News

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com

US regional bank slump goes global, driving market into gold

October 20, 2025 / www.canadianminingreport.com

Gold stocks weaker but outperform slump in other sectors

October 13, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok