Voestalpine begins operations at its carbon neutral hydrogen-production pilot plant

November 13, 2019 / www.metalbulletin.com / Article Link

Voestalpine has started operations at its pilot plant in Linz, Austria, for carbon-neutral production of hydrogen, taking a significant step towards making the project commercially viable.

The plant has capacity of more than 6 MW and will test whether the technology can produce green hydrogen via electrolysis suitable for use on an industrial scale. It is hoped hydrogen can replace the coke/coal-based blast furnace route and electric arc furnaces can be powered with green electricity partly generated using green hydrogen instead.As part of the ?,?18 million ($20...

Recent News

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok