Wallbridge confirms continuity at Beschefer project

By Canadian Mining Journal Staff / March 13, 2019 / www.mining.com / Article Link

Toronto-based Wallbridge Mining Co. has intersected 2.55 g/t gold over 20.0 metres at its Beschefer property located 28 km from the company's Fenelon gold property. Results such as this have confirmed the continuity of the gold-bearing structure at the project.

This is the company's first drill program at Beschefer, and all five holes cut significant gold mineralization in the B-14 shear zone. The holes in this program returned the following grades:

Hole BE-18-048: 2.55 g/t over 20.0 metres including 3.47 g/t over 10.3 metres and 5.90 g/t over 2.2 metres;Hole BE-18-049: 0.93 g/t gold over 20.3 metres including 2.05 g/t over 5.2 metres;Hole BE-18-050: 1.28 g/t gold over 8.2 metres;Hole BE-18-051: 3.40 g/t over 2.3 metres; andHole BE-18-052: 1.45 g/t over 6.4 metres and 0.84 g/t over 10.2 metres.

Wallbridge noted that hole BE-18-049 also intersected a narrow shear zone above the B-14 shear zone and it assayed 20.22 g/t gold over 0.5 metre.

This article first appeared in the Canadian Mining Journal.

Recent News

Gold stocks lead the large cap miners by far over H1/25

July 07, 2025 / www.canadianminingreport.com

Gold stocks up as the metal price and equities gain

July 07, 2025 / www.canadianminingreport.com

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok